Remacor, Inc.

All POLREP's for this site Remacor, Inc.
West Pittsburg, PA - EPA Region III
POLREP #196
Printer Friendly  |   PDF
 
On-Scene Coordinator - Jack Downie 4/17/2009
Emergency - Removal Action Pollution Report (POLREP) #196
Start Date: 9/15/2006
Pollution Report (POLREP) #196
Site Description
EPA has been performing an emergency removal action at this site which has primarily involved the stabilization, repackaging, transportation, and removal of hazardous magnesium materials and other solid wastes from the facility.  EPA completed repackaging abandoned magnesium materials that have been stored in drums that have succumbed to varying degrees of corrosion.  The repackaged materials have now been removed from the site.  Areas of the site including open pad areas, low areas and drainage ways have been cleared of residual wastes that had spilled when the facility was operating. Low-level radioactive solids, and miscellaneous waste material have been packaged and shipped off site for disposal. Lime was removed from eight large vertical vats located on the west and south side of building 2. The lime was neutralized and shipped off site for disposal.  Current activities at the Site are focused on separating materials from a large debris pile on the south side of the property that contains broken concrete embedded with rebar, and large pieces of scrap metal, mixed with dirt and other fines. PADEP is overseeing site activities for the state and providing support.  EPA START contractor TechLaw is providing technical and administrative support to the EPA. Site security operations are now relinquished to Lawrence County and Taylor Township officials. EPA will continue cleanup and assessment operations on an intermitant basis.

Current Activities
Personnel On-Scene:    
02/09/09 EPA-1, START-1, ERRS-8, PADEP-0, Others-0
02/10/09 EPA-1, START-1, ERRS-8, PADEP-2, Others-0
02/11/09 EPA-1, START-1, ERRS-8, PADEP-0, Others-0
02/12/09 EPA-1, START-1, ERRS-8, PADEP-1, Others-0
02/13/09 EPA-1, START-1, ERRS-8, PADEP-0, Others-0


Weather:
02/09/09  Low of 19° F, high of 41° F, partly cloudy, 0.00” precipitation, wind  0-8 mph.
02/10/09  Low of 32° F, high of 52° F, mostly cloudy, 0.25” precipitation, wind  1-9 mph
02/11/09  Low of 48° F, high of 65° F, mostly cloudy, 0.26” precipitation, wind  6-24 mph
02/1209  Low of 32° F, high of 46° F, partly cloudy, 0.11” precipitation, wind  20-37 mph
02/13/09  Low of 29° F, high of 34° F, partly cloudy, 0.00” precipitation, wind  11-14 mph

02/09/09
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities.

ERRS continued cleanup activities of the large debris piles located on the south side of building 9. The debris piles consist of large pieces of metal scrap, and large concrete chunks with rebar protruding from them and are mixed with arsenic and lead contaminated dirt and other fines. ERRS workers cut the scrap metal down to a transportable size and broke up the concrete, removing the rebar, and then cut the rebar to a suitable length for transporting. The metal was taken to a scrap yard for recycling. The concrete was staged in the same location as the concrete debris from the burn area which is south of the electrical substation and across the road.


START provided the OSC with technical and administrative assistance, conducted contractor monitoring, and written and photographic documentation.


02/10/09
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities.

ERRS continued cleanup activities of the large debris piles located on the south side of building 9. ERRS workers cut the scrap metal down to a transportable size. The concrete chunks were busted up using a backhoe and rebar was removed. The rebar was cut to a suitable length for transporting. A sifting device was used to separate the dirt and other fines from the larger concrete debris. These fines contained arsenic and lead and were staged separately.

OSC Downie met with Lawrence County Representatives to update them on status of site.

START provided the OSC with technical and administrative assistance, conducted contractor monitoring, and written and photographic documentation.

Pennsylvania Department of Environmental Protection (PADEP)  representatives Mary Hoffman and Kevin Jordan mobilized to site to assist with oversight.


02/11/09
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities.

ERRS continued cleanup activities of the large debris piles located on the south side of building 9. ERRS continued to reduce the size profile and segregate the metal, concrete, fines and debris. The concrete chunks were busted up using a backhoe. The fines which contain arsenic and lead were staged separately.
ERRS purchased and spread gravel around the work trailer area to help alleviate mud being tracked into the work trailer.

Flynns Tire Repair Service was onsite today to repair the tire on the skid loader being used at the site.

START provided the OSC with technical and administrative assistance, conducted contractor monitoring, and written and photographic documentation.


02/12/09    
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities.

ERRS continued cleanup activities of the large debris piles located on the south side of building 9.

START provided the OSC with technical and administrative assistance, conducted contractor monitoring, and written and photographic documentation.

Pennsylvania Department of Environmental Protection (PADEP) representative Mary Hoffman mobilized to site to assist with oversight.


02/13/09
Emergency and Rapid Response Services (ERRS) contractor Guardian Environmental Services, Inc. held its morning safety meeting and discussed the days planned activities.

ERRS continued cleanup activities of the large debris piles located on the south side of building 9.

START provided the OSC with technical and administrative assistance, conducted contractor monitoring, and written and photographic documentation.

02/14/09
ERRS demobed from site.


Next Steps
EPA, START and ERRS anticipate resuming Site operations on Tuesday February, 17, 2009.
ERRS will continue to separate the material from the debris piles located on the south side of building 9.  The metal will be taken to the scrap yard for recycling. The concrete will be staged onsite with the pile of concrete from the fire debris. The fines from the debris contain arsenic and lead. The fines pile that contains arsenic and lead will be sampled and disposed of accordingly.


Key Issues
None