U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Former Tombarello & Sons Property Site

All POL/SITREP's for this site Former Tombarello & Sons Property Site
Lawrence, MA - EPA Region I
POLREP #8
Special
Printer Friendly  |   PDF
 
U.S. ENVIRONMENTAL PROTECTION AGENCY
POLLUTION/SITUATION REPORT
Former Tombarello & Sons Property Site - Removal Polrep

EPA Emergency Response

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY
Region I

Subject: POLREP #8
Special
Former Tombarello & Sons Property Site
01FQ
Lawrence, MA
Latitude: 42.7174990 Longitude: -71.1410129


To:
From: Michael Barry, OSC
Date: 3/23/2012
Reporting Period: 9/26/2011 - 3/23/2012

1. Introduction
  1.1 Background
   
Site Number: 01FQ    Contract Number: EP-W-08-062
D.O. Number:      Action Memo Date: 7/7/2010
Response Authority: CERCLA    Response Type: Time-Critical
Response Lead: EPA    Incident Category: Removal Action
NPL Status: Non NPL    Operable Unit: N/A
Mobilization Date: 4/27/2011    Start Date: 4/28/2011
Demob Date: 6/30/2011    Completion Date: 9/22/2011
CERCLIS ID: MAD019426238    RCRIS ID: MAD019426238
ERNS No.: N/A    State Notification: 3-18126
FPN#:    Reimbursable Account #:

1.1.1 Incident Category
See POLREP#5


1.1.2 Site Description

See POLREP #5


1.1.2.1 Location

See POLREP #5

1.1.2.2 Description of Threat

See POLREP #5


2. Current Activities
  2.1 Operations Section
    2.1.1 Narrative
The purpose of this POLREP is to document a short remobilization to the site to repair response related damage at the residential property at 51 Hoffman Ave. .

2.1.2 Response Actions to Date
See previous POLREPs; planning meeting held with residents on 3/22/2012..

2.1.3 Enforcement Activities, Identity of Potentially Responsible Parties (PRPs)

See previous POLREPS. 

2.1.4 Progress Metrics

  2.2 Planning Section
    2.2.1 Anticipated Activities 

2.2.1.1 Planned Response Activities
The finish on the patio that was replaced at 51 Hoffman Ave is too smooth and presents a slip hazard. ERRS will mobilize to score or scarrify the concrete surface to render the surface to a rougher brushed concret surface as in a typical sidewalk to lower the slip hazard. 

2.2.1.2 Next Steps
Issue task order.
Present plan toresidents
Perform work.  

2.2.2 Issues
Residents are very concerned about impact of work to the lawn and yard and want them disturbed to the least amount possible.


  2.3 Logistics Section
    No information available at this time.

  2.4 Finance Section
    No information available at this time.

  2.5 Other Command Staff
    No information available at this time.

3. Participating Entities
  3.1 Unified Command
Not applicable

3.2 Cooperating Agencies
None at this time.

4. Personnel On Site
  None at this time.

5. Definition of Terms
  No information available at this time.

6. Additional sources of information
  No information available at this time.

7. Situational Reference Materials
  No information available at this time.