U.S. flag

An official website of the United States government

Dot gov

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

HTTPS

Secure .gov websites use HTTPS
A lock () or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Lane Plating Works 2022 - 2023 Removal Action

Images

All Images [528]
Categories
<<  <  1 2 3 4 5  ...  >  >> 
The EPA team's DustTraks and Weather Station being used for perimeter air monitoring.<br />Date Taken: 1/14/2023<br />Category: 20230114<br />Latitude: 32.6881166666667<br />Longitude: -96.7700194444444<br />Tags: Public
The EPA team finished removing the transite roof panels from the western side of the electroplating room. <br />Date Taken: 1/13/2023<br />Category: 20230113<br />Latitude: 32.6878361111111<br />Longitude: -96.7692722222222<br />Tags: Public
The EPA team beginning to remove transite roof panels from the eastern side of the roof of the electroplating room. <br />Date Taken: 1/13/2023<br />Category: 20230113<br />Latitude: 32.6878777777778<br />Longitude: -96.7691027777778<br />Tags: Public
The EPA team wetting down soil and mulch on the southern side of the building.<br />Date Taken: 1/13/2023<br />Category: 20230113<br />Latitude: 32.687725<br />Longitude: -96.769775<br />Tags: Public
The EPA team watering down soil and mulch on the southeast corner of the Site.<br />Date Taken: 1/13/2023<br />Category: 20230113<br />Latitude: 32.6879416666667<br />Longitude: -96.7687694444444<br />Tags: Public
The EPA team continuing to remove transite roof panels from the electroplating room. <br />Date Taken: 1/12/2023<br />Category: 20230112<br />Latitude: 32.6879888888889<br />Longitude: -96.7697666666667<br />Tags: Public
The EPA team's progress on removing the transite roof panels from the electroplating room.<br />Date Taken: 1/11/2023<br />Category: 20230111<br />Latitude: 32.6877585564111<br />Longitude: -96.7695930003629<br />Tags: Public
The EPA team removing the transite roof panels from the electroplating room.<br />Date Taken: 1/11/2023<br />Category: 20230111<br />Latitude: 32.6879940048917<br />Longitude: -96.7696927786938<br />Tags: Public
Interior of the electroplating room during the beginning of the transite roof panel removal.<br />Date Taken: 1/11/2023<br />Category: 20230111<br />Latitude: 32.6879971652883<br />Longitude: -96.7694095374054<br />Tags: Public
Asbestos containing material (ACM) is stored in a covered roll-off container labeled with signage and caution tape.<br />Date Taken: 1/10/2023<br />Category: 20230110<br />Latitude: 32.6876540383472<br />Longitude: -96.7696498635132<br />Tags: Public
The EPA team removing the transite roof panels from the electroplating room.<br />Date Taken: 1/10/2023<br />Category: 20230110<br />Latitude: 32.6878061883143<br />Longitude: -96.7697630525208<br />Tags: Public
The EPA team removing the transite roof panels from the electroplating room.<br />Date Taken: 1/10/2023<br />Category: 20230110<br />Latitude: 32.6877705208152<br />Longitude: -96.769604802189<br />Tags: Public
Transite roof panels and other asbestos containing material being stored in a poly lined roll-off container.<br />Date Taken: 1/9/2023<br />Category: 20230109<br />Latitude: 32.6877166666667<br />Longitude: -96.7696444444444<br />Tags: Public
The EPA team removing transite roof panels from the electroplating room.<br />Date Taken: 1/9/2023<br />Category: 20230109<br />Latitude: 32.6876611111111<br />Longitude: -96.7696611111111<br />Tags: Public
The EPA team packing windows into asbestos labeled bags before being placed in a poly lined roll-off container.<br />Date Taken: 1/9/2023<br />Category: 20230109<br />Latitude: 32.6878888888889<br />Longitude: -96.7697361111111<br />Tags: Public
The EPA team is using a scissor lift inside the electroplating room to remove transite roof panels.<br />Date Taken: 1/9/2023<br />Category: 20230109<br />Latitude: 32.6880027777778<br />Longitude: -96.7695388888889<br />Tags: Public
The EPA team using water on the building during removal operations.<br />Date Taken: 1/9/2023<br />Category: 20230109<br />Latitude: 32.6879055555556<br />Longitude: -96.7697916666667<br />Tags: Public
The EPA team completed removing transite roof panels from the south side of the front office.<br />Date Taken: 1/9/2023<br />Category: 20230109<br />Latitude: 32.687675<br />Longitude: -96.7697444444444<br />Tags: Public
The EPA team completed removing transite roof panels on the north side of the front office.<br />Date Taken: 1/9/2023<br />Category: 20230109<br />Latitude: 32.6878611111111<br />Longitude: -96.7699055555556<br />Tags: Public
The EPA team placing wet transite roof panels into the poly lined roll-off container.<br />Date Taken: 1/9/2023<br />Category: 20230109<br />Latitude: 32.687725<br />Longitude: -96.7696305555556<br />Tags: Public